Neyveli Lignite Corporation Limited

Neyveli Lignite Corporation Limited (NLC) was registered as a company in November 1956. The mining operations in Mine-I were formally inaugurated in 1957. Neyveli Lignite Corporation has been conferred with ‘Navratna’ status since 2011. Its registered office at Chennai and corporate office at Neyveli in Tamil Nadu is a pioneer among the public sector undertakings in the energy sector. NLC operates three open-cast lignite mines of the total capacity of 28.5 million tonnes per annum at Neyveli and one open cast lignite mine of capacity 2.1 million tonnes per annum at Barsingsar, Rajasthan, three thermal power
stations with a total installed capacity of 2,490 MW at Neyveli and one thermal power station at Barsingsar, Rajasthan with an installed capacity of 250 MW. All the Mines of NLC are ISO certified for a quality management system, environmental management system and occupational health and safety
management system. NLC’s growth is sustained and its contribution to India’s social and economic development is significant.